Future

FUTURE

 

Terminal Container Ravenna, is concretizing its developing plan, confident in its position as an alternative gateway to both Italy and Europe. Anew Ship to Shore crane (19 rows) is operational since August 2017 along with the other cranes which have been revamped in 2014. Three new RMG cranes are also availablein the yard, since the beginning of 2017; the new equipment replaced the existing cranes, which have been repositioned to serve the rail area (5 rail tracks, 420 meters long). Furthermore, with the Port Authority of Ravenna now commending the process intended to increase channel depth, the plan to develop a brand new container terminal to ensure Ravenna retains its leading position in the global supply chain moves closer.

 
 

 

 

Back to Top